•Development time 2~3 weeks
•Delivery time(including development
time): 4~5 weeks
•Monthly production capability 100~200 pcs
•Development time 3~5 weeks
•Delivery time(including development
time): 6~8 weeks
•Monthly production capability 50~100 pcs
•Development time 4~8 weeks
•Delivery time(including development
time): 8~12 weeks
•Monthly production capability 30~50 pcs
•Development time 8~10 weeks
•Delivery time(including development
time): 10~16 weeks
•Monthly production capability >30 pcs
Precision module design
Robotic arm module design
Vision system architecture
Whole production line plan design
Tolerance analysis
Thermal flow analysis
Stress analysis
Development capability of whole line electric control system
Traditional PLC program design (Mitsubishi , Omron etc.)
BECKHOFF PLC Assembler programming
Development tool
The programming for movement control
User interface development
Test script development
Test system architecture
Development of analog circuit, digital circuit
Multi-layer PCB Lay
Design of control board, function board
•ISO 9001:2008 authentication certificate
•Strict and professional quality management procedure.
•Thorough quality dataSupplied material check/process check/shipment check